Sande Construction came back to work on putting the brick on the side railings leading up the east entrances of the church. The same will be happening on the sides of the ramp on the south side of the church when this company has time to do it.
Sande Construction will be coming back to put metal railings on the side radiuses which have the two steps. They will also be putting a railing down on the steps leading from the street to the church. These will be mounted as soon as they are made.